Advertisement
wire mesh fence cad details 2D, Mesh Fence, Gate Detail, CADBlocksfree -CAD blocks free 11 Top Wire Mesh Fence, Details Images

11 Top Wire Mesh Fence, Details Images

Related photos in this diagram:

Other recommended diagram ideas:

Wire Mesh Fence, Details - Ndot i-eighty design build the nevada department of transportation used natina metallic to stain all of the existing chain-link fence over numerous bridges on this task. Special techniques, and lots of endurance, is needed while making use of natina steel to an already mounted fence however our professional crew got the activity carried out and anyone surely likes how this turned out.

Forty three new putting in chain hyperlink fence tension twine chain hyperlink fence anping sunshine metal product factory chain link fence drawing at getdrawings unfastened for non-public use astm a392 06 transient chain hyperlink fence panels 6ft x 10ft chain link fence drawing at getdrawings unfastened for personal use chain hyperlink fence for security transient posts ings wm.

Hf 36 38 asg 1 w 600x600 excessive protection galvanized five foot chain hyperlink fence mesh typical element of an 8 foot excessive with one 3 strand barbed wire installed transient chain hyperlink fence popular drawings chain link fence popular drawing pdf presagio dinfinito in sizing 2334 x 1534 snap shots of chain link fence gate info.

A1;0.05 a1;1.10 a1;zero.05 a1;0.60 a1;0.30 a1;1.90 a1;0.Forty a1;zero.05 a1;0.26 a1;zero.50 a1;0.60 a1;0.30 a1;0.10 a1;zero.15 a1;0.Sixteen a1;0.05 a1;zero.05 a1;3.00 a1;three.00 a1;zero.50 a1;0.50 a1;zero.50 candado cerco de cadena sistema agua potable codigo: escala: indicada plano n. 1 de 1 revisado: fecha: proyectista: dibujante: malla olimpica pl-ap-20-01 esc 1:75 piso de cemento anclaje cimiento h°c° 1:three:4 50 piedra desplazadora drenaje malla olímpica anclada en sobrecimiento 10 cm sobrecimiento h°c° 1:three:4 50 piedra desplazadora a1;malla olímpica de alambre nº 10 ; cocos 2s1#2;" esc 1:10 tesador de fierro angular 3/four" x 3/four" x 1/eight" fierro angular 3/four" x three/4" x 1/8" alambre de púas nº6 (3 hileras) tapa tubería fg ø 2" esc 1:25 cerco vista frontal drenaje pluvial tubería de % d 2" detalle poste y fundacion zero.05 1.10 0.05 0.60 zero.30 1.Ninety zero.Forty zero.05 0.26 0.50 zero.60 0.30 zero.10 zero.15 0.Sixteen zero.05 zero.05 cimiento h°c° 1:3:four 50 piedra desplazadora detalle seguro localidad: collpajahua gobierno municipal de laja tubería de fg de 1 half of " x 1.Nine m pza 2 material unid. Cant. Materiales para los angeles puerta pza pza three 2 pza 2 pza 1 tubería de fg de 1,zero " x 1.0 m bisagras prefabricadas candado tubería de fg de 1,0 " x 1.Four m m 2 malla olímpica n° 10, cocos 2 half of" kg 0.2 alambre galvanizado de three mm m zero.Four cadena cemento malla olímpica arena grava m2 kg. M3 m3 6 0.02 zero.01 piedra m3 0.02 2 descripcion unid. Cant. Fierro angular 3/4" x three/4" x 1/8" m 1 alambre de púas m three tubería % drenaje m zero.2 cemento poste tubería fg d 2" arena grava m kg. M3 m3 6 0.02 zero.02 piedra m3 zero.01 2.7 descripcion unid. Cant. Materiales por columna angular three/4" x three/four" 1/8" m 0.6 computos metricos por metro de cerco materiales por metro de cerco puerta bastidor de tubería fg 1 half of" con malla olímpica de alambre galvanizado no. 10 cocos de 2 half" con bisagras excavación p/estructuras computos metricos por columna five 5 descripcion unid. Cant. Codigo m3 zero.048 et-co-09-05 et-co-04-01-02 m3 0.016 h°c° 50 piedra desplazadora excavación p/estructuras descripcion unid. Cant. Codigo m3 zero.048 et-co-09-05 et-co-04-01-02 m3 0.041 5 five 5 h°c° 50 piedra desplazadora.